久久国产99欧美精品_亚洲AⅤ无码日韩AV妖精_国产特黄视频在线_欧美男男激情同性videos_95精品国产自产_亚洲一区二区三区无码大片_影音先锋在线资源在线观看_91免费视频在线网址_免费无码性爱高潮精品_亚洲高清欧美高清

Improve the disinfection technology of the water supply industry, and work hard for the improvement of the people's safe drinking water environment

Your Current Location : Home > News
Industry Information

The Central Environmental Protection Inspector "looks back" Hunan has already held 10 people accountable, most of them for ineffective supervision and slow actions

2020-12-17 Ou Rui

The reporter learned today from the provincial cooperation with the Central Environmental Protection Inspector’s “Looking Back” Coordinating Contact Group that since the Fourth Central Ecological Environmental Protection Inspectorate’s “Looking Back” to our province, our province has insisted on supervising while reforming and seriously holding accountability. Ten people were held accountable, and the rectification of related issues accelerated.


There is a den in Changsha County Liyuba that recycles and refurbishes waste oil drums and sells them, which produces a pungent smell of waste oil, noise and pollutes the environment. After receiving this letter and visit from the Fourth Ecological Environmental Protection Supervision Group of the Central Committee, the Changsha County Government organized relevant departments to quickly investigate the case and found that 57 large waste oil drums and 107 small waste oil drums were piled up in the open space. After verification, the den had processed waste oil drums during the day and transported and sold at night, and it did not sign a solid waste disposal contract with a qualified enterprise. At present, the local den is banned in accordance with the "scattered and polluted" enterprises, and at the same time, a qualified company is arranged to clean and transport the oil drums and sludge. The Party Committee of Ansha Town initiated the accountability procedure, and gave notifications and comments to Huangqiao Village Party Branch Secretary and environmental protection officials.


In response to the environmental damage caused by sand mining in Taoyi Village, Gaocun Town, Mayang Miao Autonomous County, the county quickly formed a supervision team to the scene. The inspection found that there were still 2 sand piles left behind in tenders 5 and 6 of the original Jinjiang river course closure, as well as two sand carriers that were unable to go ashore due to the dry season. The water conservancy department immediately organized personnel to cut the two sand-carrying ships and clean up the pebbles stored in the site. Due to inadequate supervision of the river, the county had an admonishment conversation with the captain and deputy captain of the county water administration supervision team.


Some people in Liyang Community, Lipu Street, Lixian County reported that the construction waste generated by road construction was piled on the side of the road and has not been cleaned up, affecting residents' travel. The Lipu Sub-district Office quickly arranged personnel to clear and transport the construction waste and harden the road surface. At the same time, the construction waste on both sides of the road section was cleaned and transported. Due to the problems of inadequate supervision and slow performance of duties and slow actions, Liyang community establishment specialists were exhorted to talk.


Due to the inadequate daily supervision of Hunan Chutian Barium Industry Co., Ltd., which caused complaints by the masses of noise, dust, illegal occupation of forest land and other behaviors that damage the ecological environment, member of the Party Committee of Taiping Town, Shimen County, Changde City, Director of the CPPCC Liaison Office, and the town enterprise office The director, the head of the town environmental protection station, the head of the forestry station of the town, and the head of the Chayuan Village were exhorted to talk. It is understood that at present, Chutian Barium Industry has completed the removal of waste soil, the woodland has been regreened, the dust and noise have been effectively controlled, and the houses affected by the earthquake are being relocated, and they are striving to complete the rectification and sale of the number within this month.